Glossary
Baseline survey meaning
The meaning of a baseline survey is the first measurement of a programme's indicators, taken before the programme starts, so that later change can be measured against it.
Baseline (baseline survey)
Before a county starts school meals, a baseline survey records attendance and children's height and weight, both in the schools that will get meals and in some that will not. Without it, nobody can say later what the meals changed.
A baseline only helps if it is repeated the same way. The endline asks the same questions of a comparable sample when the programme ends, and the difference between the two is the change.
A baseline survey report sets out the indicators, how each was measured, the sample and its margin of error, and the values found. Donors and county planning units use it to agree targets, so every choice the endline will have to repeat belongs in it.
Change alone does not show what caused it. Measuring the same indicators where the programme did not run, a control group, is what separates the programme's impact from everything else that happened in those years.
In TIA study can declare its baseline and endline rounds and measure the change between them.
- Related
- Endline, Indicator, Control group, Monitoring and evaluation
- Read more
- The full article in the library · On its own page